Our Work

Amgen New Albany, Ohio

Description

Hodess provided the controlled environmental systems for Amgen’s new biomanufacturing facility, part of an expansion effort aimed at increasing the production and distribution of life-saving medicines to patients across North America. The scope covered 20,000 sf and included four specialized controlled environment rooms engineered to pharmaceutical-grade standards.

The build featured two 5°C automated pallet coolers measuring 200′ x 50′ x 50′, a 5°C sample storage cooler, and a 5°C packaging and shipping cooler. All insulated panel systems were FM 4880 certified to meet pharma-grade requirements. To guarantee reliability, Hodess incorporated full mechanical and control redundancy throughout the pallet cooler rooms, pairing water-cooled primary systems with air-cooled backup systems to ensure true operational redundancy under all conditions.

The overall design emphasized sustainability and automation, with redundancies built in at every level to support consistent, uninterrupted performance for this critical stage of Amgen’s biomanufacturing pipeline.

Industry

Pharmaceutical

Project Delivery

Design Build

ISO Class

ISO Not Applicable

Similar Projects

Abzena

Pfizer (formerly Abzena) engaged Hodess for the design-build delivery of a 39,000 sf pharmaceutical cleanroom facility in Sanford, North Carolina. The project included the…

View Project
Merck Biologics Development Center

Hodess delivered a network of 19 controlled environmental rooms for Merck’s biologics development center in Rahway, NJ, supporting the site’s biopharmaceutical operations. The scope…

View Project
Fujifilm Biotechnologies Project Galaxy

Hodess delivered a comprehensive network of pharma-grade environmental rooms under a design-assist delivery model for Fujifilm Diosynth Biotechnologies’ Project Galaxy, spanning 17,465 sf across…

View Project
You have questions. We have straight answers.