Our Work

GE Healthcare Tool Installation East Greenbush, NY

Description

Hodess was the design-build cleanroom contractor for Turner Construction’s Bay Chase cleanroom project. GE Healthcare contracted Hodess directly for tool installation in a 40,000 sf ISO 5 cleanroom, utilizing modular 2″ and ½” aluminum wall panel systems. Additionally, Hodess constructed 16,000 sf of ISO Class 7 space with 2″ aluminum cleanroom grid and vinyl flooring. Responsible for designing and installing all process utilities for the tool installation, the project achieved its first LEED Gold certification. The design saved approximately $1M annually in energy costs by maintaining room specifications with lower airflows.

Industry

Medical Device / Microelectronics

Project Delivery

Design Assist

ISO Class

ISO 5, 6, 7

Similar Projects

National Semiconductor

Completed as part of an advanced microelectronics fabrication facility, Hodess was responsible for furnishing and installing the structural steel system supporting a Class 1…

View Project
Draper Labs

Hodess delivered this 6,000 SF microelectronics facility under a design-build model, constructing ISO Class 5, 6, and 7 cleanroom environments within an existing building….

View Project
WL Gore

WL Gore engaged Hodess under a design-assist for the development of a 10,000 sf ISO 7 cleanroom facility in Elkton, Maryland. The project supported…

View Project
You have questions. We have straight answers.