UTC Aerospace Hopewell, NJ

Description

Design-build of a complete new cleanroom fab in an existing 1960s Westinghouse Manufacturing building. The scope included 12,000 sf of ISO 5 cleanroom spaces, 50,000 sf of office space, and 20,000 sf of laboratory space. Hodess provided all new utilities with a central plant for CW, HW Steam, CDA, N2, DI water, WWT, PVAC, and specialty gases.

Industry

Defense / Microelectronics

Project Delivery

Design Build

ISO Class

ISO 5, 6, 7

Similar Projects

National Semiconductor

Completed as part of an advanced microelectronics fabrication facility, Hodess was responsible for furnishing and installing the structural steel system supporting a Class 1…

View Project
Draper Labs

Hodess delivered this 6,000 SF microelectronics facility under a design-build model, constructing ISO Class 5, 6, and 7 cleanroom environments within an existing building….

View Project
Massachusetts Institute of Technology Nano Fab Tool Installation

MIT contracted Hodess for the tool installation in their NANO fab in Cambridge, MA, completed in multiple phases. The Nano cleanroom is located in…

View Project